YOUR CART
- No products in the cart.
Subtotal:
$0.00
We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ...
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.
Other cookies are those that are being identified and have not been classified into any category as yet.
Click here to see detailed information about the product
Manufacturer | Tides Marine |
---|---|
Product Code | WATERPICKUP |
Product Line | TEES |
Price Price $105.92
Description
TK2250-1/2-.375 Water Pick-Up Kit consists of:
Hose Barb KitsHose barb kits contain a straight brass hose barb which can be threaded into any number of pick-up points in the water pump, gear cooler or heat exchanger. These hose barbs are sized to match the corresponding fitting on each SureSeal. The kit includes 8′ of marine grade silicone fuel hose and all necessary hose clamps. |
Please note that the use of hose barbs in the raw water cooling system requires good care during installation and additional maintenance once installed.
Sediment, engine scale, rust and other debris are prone to collect in such 90° turns.
Water pick-up hose should be routed from the pick-up point on the engine to the SureSeal® in a manner which eliminates / minimizes the possibility of chafing, burning or kinking. Turns made by the hose should be minimized to improve water flow.
Support clips / clamps / ties used to dress the hose should not be so tight as to crush the hose / restrict water flow.
Tides also recommends that a bit of slack be left in the hose near the SureSeal® to allow for some movement. This will minimize loading of the SureSeal® on the shaft during normal vessel operation.
Hose Inside Diameter A | Hose Tee Length B | Branch Hose Barb Size C | Part Number | Buy Online |
---|---|---|---|---|
3/8 | 1 7/8 | 3/8 | TK0375-3/8-.275 | Buy Now |
5/8 | 1 7/8 | 3/8 | TK0625-3/8-.218 | Buy Now |
3/4 | 1 7/8 | 3/8 | TK0750-3/8-.218 | Buy Now |
1 1/4 | 1 7/8 | 3/8 | TK1250-3/8-.218 | Buy Now |
1 1/2 | 1 7/8 | 3/8 | TK1500-3/8-.218 | Buy Now |
1 5/8 | 1 7/8 | 3/8 | TK1625-3/8-.218 | Buy Now |
1 3/4 | 2 | 3/8 | TK1750-3/8-.218 | Buy Now |
2 | 2 1/2 | 3/8 | TK2000-3/8-.218 | Buy Now |
The following is a brief overview of the typical installation procedure. BE SURE TO FOLLOW THE INSTRUCTIONS INCLUDED WITH EACH KIT. Failure to follow the instructions could result in damage to the SureSeal or your engine.
3A. If using a threaded fitting-type pick-up, remove the appropriate plug or drain. Using a small screwdriver or awl, poke/scrape the inside of the opening to dislodge or remove any engine scale, sediment, debris, etc. which could clog the line. Coat the threads of the fitting with sealant and install.
6A. For twin-engine applications, we recommened the use of a crossover line between port and starboard SureSeals to insure proper lubrication and cooling water to both seals in the event that only one engine is running. Before installing a crossover line, you must inspect the vessel’s raw water exhaust system. DO NOT USE A CROSSOVER LINE if the highest point in the exhaust system is above the turn of the exhaust riser. “back flow” could occur while running on only one engine causing serious damage to the other engine/turbo. For all Crossover setups, a second fitting is required on each SureSeal.
8A. To test a “Double Injection” set-up, remove the crossover hose from one SureSeal. Cap the injection fitting as described above. Start the other engine and run in neutral. Hold the end of the crossover hose above the level at which the cooling system water enters the manifold. A steady flow of water indicates there is suffcient pressure for proper function. Reconnect the hose and repeat the process for the other engine. Dress the crossover hose and secure with cable ties (loosely).
Water Pick-Up Kits may be ordered online. Buy Now
To determine which water pick-up kit to order, first identify the point in the engine’s raw water cooling system from which you plan to take the water for your SureSeal.
Click here to Download Complete Water Pick-up Kit Installation Instructions.